|
The Lakeshore Ranch HOA was pleased to have the funds to complete the following community improvement projects in 2011.
-
Boardwalk: All of the wood on the boardwalk was replaced with pressure treated wood. The new boardwalk is scheduled to be sealed in the fall.
-
Entrance signs: Both of the entrance signs were refinished and repainted. The stucco signage walls were pressure washed and repainted.
-
Playground area: A new playground retention wall was installed, the play set was pressure washed and repaired, and new ground cover was added.
 Boardwalk before improvements, 2011
 Boardwalk after improvements, 2011
 Entrance sign before improvements, 2011
 Entrance sign after improvements, 2011
 Playground before improvements, 2011
 Playground area after improvements, 2011
|
|